How this works: powerline approach distances differ by state and by voltage, so this tool asks guiding questions rather than quoting limits. The ranges below are indicative only. Always confirm the actual distances and any permit or spotter requirements with your state regulator and the network operator.
General guidance only. This tool gives indicative results from the numbers you enter. It is not engineering advice, a compliance assessment or a substitute for a competent person, AS 2550 requirements or your crane manufacturer's documentation. Verify anything safety-critical with a qualified professional before acting on it.
Talk through the requirement
Need a crane inspection?
Share the equipment type, location and inspection history so the right service pathway can be confirmed.
Related Free Tools
Safety & Operations
Pre-Start Checklist Generator
A printable daily pre-start sheet tailored to your crane type.
Open toolSafety & Operations
Crane SWMS Generator
A starting safe-work-method-statement framework for crane operations.
Open toolSafety & Operations
Lift Plan Generator
A structured lift plan covering load, crane, rigging and site checks.
Open tool